Calcrete
Structural work

Fence Calculator

Posts, panels or pickets for a straight fence run.

Panels, sheets or pickets to buy
222 pcs
Posts
14 pcs
Sections
13 pcs
Equal post spacing
7.692 ft
Rails
26 pcs
Material cost
—
Excludes delivery and accessories

How it works

The run is divided into sections no longer than the spacing you enter. One straight run needs one more post than sections. Pickets use their width plus the clear gap. Gates, corners and different runs should be calculated separately.

sections = ⌈run length ÷ maximum spacing⌉; posts = sections + 1

How the Fence Calculator works

Count posts, sections and panels or pickets for one straight uninterrupted fence run. The maximum post spacing and rails per section are supplied by your fence plan.

Sections determine posts

A 100 ft run with a maximum 8 ft spacing needs 13 sections and 14 posts. Equal spacing would be 100/13 = 7.692 ft. Two rails per section mean 26 rails. Check the actual panel system dimensions before setting posts.

Pickets and purchasing allowance

At 5.5 in picket width with a 0.5 in clear gap, the run needs 201 pickets before allowance. Adding 10% and rounding up gives 222 pickets. A final edge may require cutting; this is a single-row estimate.

Overlapping fence sheets use the effective width after overlap; their count is independent of post spacing. Panels use one panel per calculated section before allowance. Gates, corners and changes of direction require separate runs. When combining runs, deduct shared posts once and add the specified gate components. Estimate concrete for known pier sizes in the footing calculator.

FAQ

Can I enter an entire property perimeter? expand_more

Use separate straight runs for post counts, then reconcile shared corner posts and gate openings.

Does it select a safe post spacing? expand_more

No. Spacing is a user input from the selected fence system or plan.

What receives the waste allowance? expand_more

Panels, sheets or pickets. Posts and rails are the net count for the run, so additional spare stock is ordered separately.